The project, being delivered by main contractor Robertson North East for Jansons Property, involved two separate buildings. An existing two-storey brick building (‘Building A’ or ‘Weardale’) was refurbished, creating 24 studio bedrooms and communal rooms; while a new three-storey H-shaped block (‘Building B’) was constructed, giving 30 clusters of 4–6 bedrooms with communal kitchens, and 34 studio bedrooms.

Robertson Engineering Services installed each bedroom with prefabricated en-suite shower facilities and electrical panel heating. We fitted a localised fire suppression system to the studios, which had a hob and cooker near the corridor door.

We installed and commissioned a single gas-fired, mains feed hot water heater to feed the existing Weardale building.

In the new H-shaped block, we provided central hot water service plant, which comprises a heat-led CHP system (combined heat and power), to warm a buffer vessel that serves a primary calorifier. The hot water heating is then supplemented by two gas-fired water heaters.

We also provided the usual electrical services along with dry risers and natural smoke ventilation systems, associated with each of the two stair cores.

Requirements & challenges

The building sits on a flood plain, so is elevated by about 1.5m. This meant that floor defence door barriers were required, while all ground floor penetrations needed to have rubber seals.

We had to work closely with the main contractor to ensure efficient sequencing and achieve completion on time. On the new H-block, it was key to carefully co-ordinate access, so we could install pipework services when the prefabricated shower rooms were being positioned.

Solutions & outcomes

Rather than installing the shower rooms in a horizontal sequence on the new H-shaped block, we installed all pipework, testing and lagging each riser, and then located the shower rooms to three floors of clusters. This was done in a two-week sequence. It allowed second-fix wall boarding to follow on in the same two-week sequence, so that all trades were able to keep to the tight construction programme.

Student accommodation provider Unite will own and manage the accommodation.

Jansons Property, construction consultant at Paul Nash, said the firm is “delighted” to have completed its first student accommodation scheme in Durham, adding: “We were aware of Robertson’s track record and experience in this sector but it was their approach to delivery that set them apart on this project”.

 

Related news

  • Hamilton Park Racecourse hosts charity f...

    Hamilton Park Racecourse hosts charity f...

    It was a day at the races with a difference as a group of runners from Robertson took part in a charity fun run.
  • The Robertson Academy launches

    The Robertson Academy launches

    The Robertson Academy is a transformational approach to employee development.
  • Construction completes on major office b...

    Construction completes on major office b...

    A major new office development has been handed over to Clyde Gateway 

Related blog posts

  • How do we demonstrate the social value of construction projects?

    How do we demonstrate the social value of construction projects?

    Find out how social value is at the heart of everything we do, and we create long-term social value from the projects we deliver.
  • How CAFM can save you time and money

    How CAFM can save you time and money

    How capturing information about building assets during design and construction phases can save time and money in the long term.
  • Facing up to the home truths of the housing crisis

    Facing up to the home truths of the housing crisis

    The current housing crisis is a well-publicised and widely discussed issue within political and industry circles...