Procter & Gamble’s Newcastle Innovation Centre (NIC) focusses on research and development of consumer products and was originally opened in 1957, before it was acquired by P&G.

Upgrading the NIC involved the installation of new office and laboratory lighting, air conditioning cassette units and ventilation grilles. The associated ductwork had to be isolated, removed and replaced within a new ceiling. 

Coordination to avoid loss of production

The project had to be carried out within a live working environment, without causing any loss of production to the facility.

To achieve this, detailed coordination with the client was required, transferring out the offices and laboratory in phases to allow the work to take place.

We worked to a very tight programme with little room for error as rooms had to be re-occupied before the next room could be decanted to allow the sequence to roll on.

Phase 1 upgrades

Phase 1 of the project involved the relocation of existing roof-mounted plant and equipment. This allowed construction of the new maintenance corridor, located on the flat roof along the length of the main building, directly above the existing ground floor service void.

All live mechanical and electrical services were relocated from the existing ceiling void into the new maintenance access corridor, and redundant services stripped out.

To improve the building’s efficiency, existing lighting was replaced with LEDs controlled by local PIR controls within the rooms, along with new ceiling-mounted air conditioning / fan coil units and new supply / extract ventilation grilles, fed from roof-mounted air handling units.

Other works included emergency lighting, a fire suppression sprinkler system and a BMS, installed by MCE Scotland.

Phase 2 refurbishments

For phase 2, we refurbished the first floor of the pilot building, used for piloting new products. All existing M&E services were stripped out in their entirety.

Electrical works included new lighting, power, fire alarms and data, while the mechanical package consisted of a new air conditioning system, supply and extract ventilation systems and heat recovery units to serve existing perimeter radiator heating.

New male, female and disabled toilets were formed within the floor plan.

Within the laboratory, six existing fume cupboards were refurbished with new extract ventilation ductwork; as well as new supply and extract ventilation, and air conditioning served by ceiling-mounted cassette units.

Logistics to ensure continuity of services

Both phases were carried out while the whole site remained operational, so we had to plan and implement works to ensure that no services were lost to the client, including working on existing services over weekends.

It was a pleasure to work with such a proactive company and I would recommend Robertson for any future projects

– Archana Roy, Senior Project Manager, JLL

 

 

Related news

  • 28 new homes proposed at Laurieston

    28 new homes proposed at Laurieston

    Laurieston Living in Glasgow could soon add more than two dozen new homes to the scope of its ongoing development.
  • Innovation campus in North Ayrshire comp...

    Innovation campus in North Ayrshire comp...

    We have completed work on a major innovation campus in Ayrshire which will support businesses across the region.
  • College students swap classrooms for con...

    College students swap classrooms for con...

    Students from Edinburgh College have taken their learning out of the classroom thanks to a partnership with Robertson. 

Related blog posts

  • Careers in construction: health and safety manager and apprentice quantity surveyor

    Careers in construction: health and safety manager and apprentice quantity surveyor

    Two of our employees in North West England took part in this session for students considering careers in construction.
  • Offsite manufacturing: installing windows in closed timber panels

    Offsite manufacturing: installing windows in closed timber panels

    How offsite manufacturing techniques, in particular installing windows in closed timber panels, benefits construction.
  • Back to the floor: engineering apprenticeships

    Back to the floor: engineering apprenticeships

    Robertson Engineering Services Managing Director, Darren Clarke, meets with mechanical and electrical engineering apprentices.