The project involved the construction and fit-out of a modular, six-storey hotel at the ABZ Business Park. The ground floor contains the reception, bar, restaurant, and IT and meeting facilities, with guest rooms on the upper floors.  

Speedy construction through modularisation 

To maximise build speed, and increase quality and safety, we used Vastint’s innovative modular construction technique. The upper levels were constructed using modular CLT pod construction, manufactured in Italy and transported in sections to be assembled on site.  

The pre-fabricated components were built on top of the steel-framed ground floor, where they were bolted together, effectively creating the structure as each floor was added. The modular services were then connected and external cladding installed to create the finished shell. We then completed fixed furnishing and fitting out. 

This technique provided a number of benefits, including: 

Securing repeat business by pleasing our client 

We were originally appointed as project manager for the modular construction of this hotel but, since Vastint were pleased with our performance, we were later awarded the fit-out contract as well. This meant the fit-out works could start immediately after construction, without the need for a new contractor to set up and familiarise themselves with the site.  

In addition, we have been awarded the project management contract for a second Moxy hotel in Glasgow.  

 

Related news

  • 28 new homes proposed at Laurieston

    28 new homes proposed at Laurieston

    Laurieston Living in Glasgow could soon add more than two dozen new homes to the scope of its ongoing development.
  • Innovation campus in North Ayrshire comp...

    Innovation campus in North Ayrshire comp...

    We have completed work on a major innovation campus in Ayrshire which will support businesses across the region.
  • College students swap classrooms for con...

    College students swap classrooms for con...

    Students from Edinburgh College have taken their learning out of the classroom thanks to a partnership with Robertson. 

Related blog posts

  • Careers in construction: health and safety manager and apprentice quantity surveyor

    Careers in construction: health and safety manager and apprentice quantity surveyor

    Two of our employees in North West England took part in this session for students considering careers in construction.
  • Offsite manufacturing: installing windows in closed timber panels

    Offsite manufacturing: installing windows in closed timber panels

    How offsite manufacturing techniques, in particular installing windows in closed timber panels, benefits construction.
  • Back to the floor: engineering apprenticeships

    Back to the floor: engineering apprenticeships

    Robertson Engineering Services Managing Director, Darren Clarke, meets with mechanical and electrical engineering apprentices.