The project involved the construction and fit-out of a modular, six-storey hotel at the ABZ Business Park. The ground floor contains the reception, bar, restaurant, and IT and meeting facilities, with guest rooms on the upper floors.  

Speedy construction through modularisation 

To maximise build speed, and increase quality and safety, we used Vastint’s innovative modular construction technique. The upper levels were constructed using modular CLT pod construction, manufactured in Italy and transported in sections to be assembled on site.  

The pre-fabricated components were built on top of the steel-framed ground floor, where they were bolted together, effectively creating the structure as each floor was added. The modular services were then connected and external cladding installed to create the finished shell. We then completed fixed furnishing and fitting out. 

This technique provided a number of benefits, including: 

Securing repeat business by pleasing our client 

We were originally appointed as project manager for the modular construction of this hotel but, since Vastint were pleased with our performance, we were later awarded the fit-out contract as well. This meant the fit-out works could start immediately after construction, without the need for a new contractor to set up and familiarise themselves with the site.  

In addition, we have been awarded the project management contract for a second Moxy hotel in Glasgow.  

 

Related news

  • UKs largest hydrogen fuel cell arrives a...

    UKs largest hydrogen fuel cell arrives a...

    The largest hydrogen fuel cell installation in the UK has arrived at the Aberdeen Exhibition and Conference Centre (AECC).
  • Employability minister helps celebrate s...

    Employability minister helps celebrate s...

    Our commitment to addressing the skills gap in construction has been praised by the Minister for Employability and Training.
  • Robertson secures £13m work on smolt ha...

    Robertson secures £13m work on smolt ha...

    Scottish Sea Farms’ £37m investment in an onshore hatchery is moving forward with construction now underway at its site near Oban.

Related blog posts

  • Offsite manufacturing: installing windows in closed timber panels

    Offsite manufacturing: installing windows in closed timber panels

    How offsite manufacturing techniques, in particular installing windows in closed timber panels, benefits construction.
  • Back to the floor: engineering apprenticeships

    Back to the floor: engineering apprenticeships

    Robertson Engineering Services Managing Director, Darren Clarke, meets with mechanical and electrical engineering apprentices.
  • A route in to modern apprenticeships

    A route in to modern apprenticeships

    Robertson’s Dundee office has seen various young people start apprenticeships and progress in their careers in the past few years.