Robertson works to BIM Level 2 standards. Our vision is to use digital technology over the full project lifecycle: from design right the way through to on-site activities through to handover to our customers and the end users.

At the design stage, BIM allows 3D drawings from a range of consultants to be consolidated into a single model. This enables clash detection at an early stage.

The use of this 3D modelling technology takes the guesswork out of trying to visualize an exact design from a drawing.

Using BIM 360, we make construction drawings and documents available via mobile devices to our teams on site, increasing efficiency and productivity between our site managers and the supply chain. Being able to access 3D models using a mobile tablet on site, makes it much easier for our site managers and subcontractors to visualise the design and speeds up the process of assessing the quality of construction detail.  

BIM 360 also provides our customers with greater visibility of progress and helps support stronger communication and relationships.

Thanks to the high level and quality of documentation and document organization in BIM 360, our customers have access to everything they need to operate their building effectively well into the future.