Delivering success in a very tight, very busy environment

"The ECC is surrounded by facilities that had to continue to deliver healthcare without interruption. To put up a building of that excellence, magnitude and complexity in that environment, so close to current clinical services, and the level of communications that this has involved, is pretty outstanding."

Dr Angus Cooper, ECC Lead Clinician

This project involved the construction of a 10-storey Emergency Care Centre in the middle of the biggest teaching hospital campus in Europe. The site was surrounded on all sides by the existing A&E department, a children's hospital and a variety of other clinical facilities. It is an excellent example of Robertson's ability to deliver a large, complex project on a tight site in the heart of a live, operational working environment.

Under budget and on programme

Within this extremely sensitive setting, and with up to 400 operatives on site at any given time, Robertson undertook major demolition, earthworks, piling operations and concrete formwork, with new retaining structures built immediately adjacent to occupied buildings in order to protect them during construction. The new building houses a state-of-the-art A&E facility along with all the supporting diagnostic arrangements.

"I have never worked on a building project that has been as successful as the one involving Robertson and ourselves for the Emergency Care Centre."

Richard Carey, then Chief Executive of NHS Grampian

We completed the £81m contract to deliver the Emergency Care Centre under budget and on programme, despite alterations to the original client requirements. In fact, £6m of additional works were delivered within the original contract date.

Some impressive figures accompany the completed project: The ECC contains enough plasterboard to clad the Empire State Building, flooring that could cover seven football pitches, 500 miles of wiring and 8000 light fittings!

The ECC (now officially named the Matthew Hay Building) has a gross internal floor area of 35,000m2 spread over eight floors, supported within a post-tensioned concrete frame superstructure on 550 concrete piles. Robertson developed an innovative approach to the construction of the building, switching from the proposed steel frame to a concrete solution. This reduced the overall building height and allowed us to use modular, prefabricated services installations.

 

Related news

  • UKs largest hydrogen fuel cell arrives a...

    UKs largest hydrogen fuel cell arrives a...

    The largest hydrogen fuel cell installation in the UK has arrived at the Aberdeen Exhibition and Conference Centre (AECC).
  • Employability minister helps celebrate s...

    Employability minister helps celebrate s...

    Our commitment to addressing the skills gap in construction has been praised by the Minister for Employability and Training.
  • Robertson secures £13m work on smolt ha...

    Robertson secures £13m work on smolt ha...

    Scottish Sea Farms’ £37m investment in an onshore hatchery is moving forward with construction now underway at its site near Oban.

Related blog posts

  • Offsite manufacturing: installing windows in closed timber panels

    Offsite manufacturing: installing windows in closed timber panels

    How offsite manufacturing techniques, in particular installing windows in closed timber panels, benefits construction.
  • Back to the floor: engineering apprenticeships

    Back to the floor: engineering apprenticeships

    Robertson Engineering Services Managing Director, Darren Clarke, meets with mechanical and electrical engineering apprentices.
  • A route in to modern apprenticeships

    A route in to modern apprenticeships

    Robertson’s Dundee office has seen various young people start apprenticeships and progress in their careers in the past few years.