St John’s Hospital is the regional hand trauma unit and is the referral and treatment centre for patients throughout Lothian.

RMF Health (comprising Robertson and FES) delivered this project as a joint venture under Healthcare Frameworks 2. It is the first phase of a proposed expansion of the orthopaedic services on site that will ultimately provide additional accommodation for head and neck services.

I’m delighted - this refurbishment will vastly improve the access for patients to these services.

– Aris Tyrothoulakis, Interim Site Director, St John’s Hospital, NHS Lothian

St John’s Hospital is the regional hand trauma unit and is the referral and treatment centre for patients throughout Lothian. As well as the additional theatre, the reconfiguration of the existing ward will create a new day surgery unit with two theatres, and will improve access for patients requiring hand trauma surgery.

A new theatre had been identified as an area for improvement, and will mean more patients can be seen. Patients waiting for hand trauma surgery can sometimes be admitted for an overnight stay, and this refurbishment will provide additional capacity for up to ten theatre sessions per week.

St Johns Hospital Ward 20 refurbishment

 

Related news

  • College students swap classrooms for con...

    College students swap classrooms for con...

    Students from Edinburgh College have taken their learning out of the classroom thanks to a partnership with Robertson. 
  • Construction of Muirfield and Ladyloan p...

    Construction of Muirfield and Ladyloan p...

    The work to replace two Arbroath primary schools as part of ;multi-million-pound project was marked by two official site visits.
  • Planning permission - Pennywell phase 3

    Planning permission - Pennywell phase 3

    Planning permission for the next phase of the Pennywell Living development has been granted by the City of Edinburgh Council.

Related blog posts

  • Careers in construction: health and safety manager and apprentice quantity surveyor

    Careers in construction: health and safety manager and apprentice quantity surveyor

    Two of our employees in North West England took part in this session for students considering careers in construction.
  • Offsite manufacturing: installing windows in closed timber panels

    Offsite manufacturing: installing windows in closed timber panels

    How offsite manufacturing techniques, in particular installing windows in closed timber panels, benefits construction.
  • Back to the floor: engineering apprenticeships

    Back to the floor: engineering apprenticeships

    Robertson Engineering Services Managing Director, Darren Clarke, meets with mechanical and electrical engineering apprentices.